- Tire out the car on the elevator and cover wings with protective covers.
- Remove a decorative front grille (see the Head Kuzov), the top cover of the inlet pipeline and the battery together with the pallet.
- Include the 4th transfer and record RKPP in this situation then give a collar of fastening of a rod of the drive of gear shifting to draft (see the Section Removal and installation of a casing of the lever of gear shifting).
- Raise a gear shifting lever cover. Include the 3rd transfer that the rod left draft, and establish a stopper in a lever casing (see the Section Removal and installation of a casing of the lever of gear shifting).
|
- Remove a clip from the executive cylinder, disconnect the giving hose from the cylinder and establish a clip into place.
|
|
- Separate the socket (14) of an electrical wiring of D/V of lamps of a backing, turn out 3 top bolts of fastening of RKPP (15) and establish on their place the directing hairpins (16).
|
- Separate the electrical wiring socket(s) a lambda probe(s).
|
- Disconnect (18) draft of the drive of gear shifting from RKPP, give a nut (19) of a back support of the power unit and 3 bolts (20) of fastening of a pillow of this support.
|
|
Completely do not turn out bolts. |
- Hang out the power unit on the beam established on wings.
- Lift the car, remove forward wheels and the lower protection covers of a motive compartment.
- Remove forward section of an exhaust pipe (see the Section Adjustment, removal and installation of the drive of gear shifting and the lock of ignition).
|
- Remove a rack between the engine and its support.
|
- Remove a rack between the engine and its back support then remove a back support with a pillow.
|
Draft of gear shifting is removed together with a support. |
|
- Turn out a bolt (28) of fastening of a forward support of the engine to a stretcher and bolts (29) of fastening of the steering mechanism.
|
- Remove collars (30) of fastening of the giving GUR lines to a stretcher, remove from it the case of the air cleaner (31), release from plastic holders on a stretcher of the K/V line and separate (33) from the intercooler an engine cooling system radiator.
|
- On both sides of the car give bolts of fastening of spherical support of a suspension bracket (35) to rotary fists and bolts of racks of the stabilizer of a suspension bracket (36).
|
|
- Turn out the lower bolts (37) and remove a protective plate behind a flywheel.
|
|
On B235R engines turn out bolts of fastening of the pallet of a case of the engine to RKPP. |
- Turn out 4 bolts of fastening of a back basic plate and 2 bolts on a stretcher (38). Then install the special stand under a stretcher and give the remained 4 bolts (40) of fastening of a stretcher.
- Lower a stretcher and take it aside. At the same time remove 2 forward support of the giving GUR line.
- Suspend the oil cooler so that it did not prevent work.
- Empty RKPP, disconnect the right power shaft and suspend it on a plait.
- Disconnect both wires of weight from RKPP and lower the car.
|
- Turn out bolts and nuts (46) of the left pillow of the engine and remove it.
|
- Lower the power unit so that RKPP was exempted from a structural element.
- Remove its support (48) from RKPP and lift the car.
|
- Fix special adaptation on a jack, level its center with the RKPP center and with its interfaced surface.
|
|
- Turn out 2 remained bolts of fastening of RKPP to the engine, separate them and remove RKPP from special adaptation.
|
|
|