bcee4405

10.2.3. Removal and installation of the main and executive cylinders

Main cylinder

 PERFORMANCE ORDER

  1. Remove the lower left part of the dashboard (under a steering wheel).
  2. Remove a spring from a coupling pedal, then remove a clamp and take out a pin.
  3. Remove the rechargeable battery. On the diesel V6 models remove the top thermofilter of a turbocompressor.
  4. Remove the assembly block of the relay and safety locks a motive compartment aside.
  5. Pump out brake fluid from the pumping union.
  1. Disconnect the giving hose (9) from the tank of brake fluid and separate the socket (10) of the ABS block. Take the socket aside.
  1. Clear area around connections of brake tubes (13), disconnect them and a zakuporta open openings.
  2. Remove the ABS block.
  1. Give fixture and remove ABS arm.
  1. Remove a bracket (16) of fastening of the giving tube to the main cylinder, disconnect a tube (17) and turn out nuts (18) of fastening of the main cylinder (19).
  1. Remove the old main cylinder and rearrange a hose (20) on the new cylinder.
  2. Installation is made upside-down. After installation pump over coupling (see the Section Pumping of Coupling and Its Executive Cylinder).

Executive cylinder

 PERFORMANCE ORDER

  1. Remove RKPP (see the Head the Manual box of gear shifting) and disconnect from the cylinder the giving tube (2).
  1. Turn out three bolts of fastening (3) of the executive cylinder and remove it.
  2. Grease bolts of fastening of the cylinder with the fixing sealant and fix the cylinder.
  3. Install the giving tube on the main cylinder and pump over it before the RKPP installation (see the Section Pumping of Coupling and Its Executive Cylinder).
  4. Establish RKPP and pump over coupling (see the Section Pumping of Coupling and Its Executive Cylinder).