Saab 9-5 - Repair manual and operation
1. Introduction
2. Governing bodies and methods of operation
3. Settings and routine maintenance of the car
4. Engine
5. Cooling systems of the engine, heating, ventilation and air conditioning
5.1. Engine cooling system
5.2. Systems of heating, ventilation and air conditioning
5.2.1. General information
5.2.2. Removal and installation of the control unit of system of ventilation with a heater and To/in, removal and installation of the broad valve
5.2.3. Replacement of the valve of a cut-off of cooling liquid and it Ý/m valve
5.2.4. Removal and installation of the fan of a heater
5.2.5. Removal and installation of the heat exchanger
5.2.6. Removal, repair and installation of the K/V compressor
5.2.7. Removal and installation of the sensor of temperature in salon
5.2.8. Removal and installation of the step engine of the gate of mixing of air and э / air circulation mode gate motor
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting
9. Automatic transmission
10. Coupling and power shafts
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
5.2.5. Removal and installation of the heat exchanger
PERFORMANCE ORDER
Disconnect heat exchanger hoses from the engine.
Give through an opening in a head of cylinders compressed air to empty the heat exchanger.
Purge of liquid of the heat exchanger of 4-cylinder petrol engines.
Purge of liquid of the heat exchanger of petrol V6 engines.
Remove the main ware box and a side part of finishing of the central console of the dashboard.
Remove the gate from an air duct.
Do not remove an epiploon.
Separate the socket of tubes of the heat exchanger.
Turn out 4 bolts and remove the heat exchanger.
Installation is made upside-down. Use
new
consolidations.