bcee4405

6.4.14. Removal and installation of nozzles

 PERFORMANCE ORDER

  1. Remove the top section of the inlet pipeline (see the Section Removal and installation of the inlet pipeline).
  2. Separate sockets of nozzles, ECT sensors, pressure of pressurization, CKP, the vacuum tank of a turbocompressor and the EGR valve. Remove cable channels from covers of heads of cylinders.
  3. Remove the holder of an electrical wiring from a back head of cylinders and an arm of the generator.
  4. Remove the electrical wiring fixed on the giving and returnable fuel lines.
  5. Remove tubes of nozzles (see an illustration).
  1. Remove returnable fuel lines together with arms from a back row of cylinders and take them aside.
  1. Pick up the forward water phone from the inlet pipeline and a head of cylinders (10 on an illustration).
  1. Remove from a cover of a head of cylinders a hose of ventilation of a case (11 on an illustration) and uncover heads of cylinders (12).
  1. Remove holders of nozzles (13 on an illustration), and then returnable fuel lines with nozzles (14).
  1. Installation is made upside-down. Use new consolidations of the understanding connections.